Neighborhood Action Plan Summary - Phase II
JUMP TO PHASE I REPORT --- JUMP TO PHASE III REPORT
Longfellow |
Strategy | Plan Funds | Plan Total | Additional NRP Funds | NRP Total | - |
Citation | Strategy Name | Early Access | Action Plan | Phase I Rollover | Reserve Funds | Program Income | Plan Funds for Housing | Mod #s Affecting Strategy |
|
IMPLEMENTATION AND ADMINISTRATION |
1.A.1. |
Phase II Plan Development |
$74,392.50
|
| $74,392.50
|
|
|
| $74,392.50
| $55,794.38
| |
1.B.1. |
Phase II Administrative Support |
| $745,028.97
| $745,028.97
| $1,051,855.84
|
| $130,824.82
| $1,927,709.63
| $558,771.73
| 3,4,5,6,7,8,12,18,20,21,22,23 |
|
COMMUNITY CONNECTIONS |
2.A.1. |
Communications to Welcome and Inform Residents |
| $24,869.00
| $24,869.00
| $17,500.00
|
|
| $42,369.00
| $18,651.75
| 2,13,14,15,16,17 |
2.A.2. |
Support Community Volunteers |
| $10,688.00
| $10,688.00
|
|
|
| $10,688.00
|
| 16 |
2.A.3. |
Fundraising Events |
|
|
|
|
|
|
|
| |
2.A.4. |
Promote Institutions that Foster Relationships |
| $19,590.00
| $19,590.00
|
|
|
| $19,590.00
|
| 16,19 |
2.A.5. |
Welcome Resident from Other Cultures |
|
|
|
|
|
|
|
| |
3.A.1. |
Howe School Reuse |
|
|
|
|
|
|
|
| |
3.A.2. |
Community Art Events |
| $10,000.00
| $10,000.00
| $40,000.00
|
|
| $50,000.00
|
| 20 |
3.A.3. |
Community History Play |
|
|
|
|
|
|
|
| 10 |
3.B.1. |
Home Tour Participation |
|
|
|
|
|
|
|
| |
3.B.2. |
Promote Longfellow Business |
|
|
|
|
|
|
|
| 10,13 |
3.B.3. |
Develop Unique Longfellow Identity |
| $1,500.00
| $1,500.00
|
|
|
| $1,500.00
|
| |
3.C.1. |
Longfellow History Project |
| $12,000.00
| $12,000.00
| $33,350.00
|
|
| $45,350.00
|
| 2,8,17 |
4.A.1. |
Senior Initiatives |
| $1,440.00
| $1,440.00
|
|
|
| $1,440.00
|
| 19 |
4.A.2. |
Youth Engagement Program |
| $11,650.00
| $11,650.00
| $5,390.13
|
|
| $17,040.13
|
| 7,13 |
4.A.3. |
Youth Program Collaborations |
|
|
|
|
|
|
|
| |
5.A.1. |
Facilitate Access to Crime and Safety Information |
| $28,075.00
| $28,075.00
|
|
|
| $28,075.00
|
| 13,16 |
5.A.2. |
Support Block Clubs |
| $13,188.00
| $13,188.00
| $4,912.32
|
|
| $18,100.32
|
| 7,16 |
5.A.3. |
Seward/Longfellow Restorative Justice |
| $10,000.00
| $10,000.00
|
|
|
| $10,000.00
|
| |
5.A.4. |
COPSIRF |
|
|
|
| $31,200.00
|
| $31,200.00
|
| |
|
HOUSING |
6.A.1. |
Housing Office 2 |
| $502,194.53
| $502,194.53
|
|
|
| $502,194.53
| $502,194.53
| 7,16 |
7.A.1. |
Home Improvement Programs |
| $405,500.00
| $405,500.00
| $191,712.00
|
| $4,258.00
| $601,470.00
| $405,500.00
| 7,12,18,20,23,24 |
7.A.2. |
Incentives for Sustainable Technologies |
| $30,000.00
| $30,000.00
|
|
|
| $30,000.00
| $30,000.00
| 18 |
8.A.1. |
Housing Development Incentives |
|
|
|
|
|
|
|
| 14,18,23 |
9.A.1. |
Support for Increased Housing Options |
| $151,861.00
| $151,861.00
|
|
|
| $151,861.00
| $151,861.00
| 23 |
9.A.2. |
AH - Hiawatha Commons |
|
|
|
| $500,000.00
|
| $500,000.00
|
| |
|
COMMERCIAL REVITALIZATION |
10.A.1. |
Commercial Revitalization Support |
|
|
| $11,700.00
|
|
| $11,700.00
|
| 7,9,16,18,23,24 |
10.B.1. |
Address Parking Issues |
|
|
|
|
|
|
|
| |
10.C.1. |
Improve Bicycle and Pedestrian Conditions |
| $2,500.00
| $2,500.00
|
|
|
| $2,500.00
|
| 18 |
11.A.1. |
New and Existing Business Staff Support |
|
|
|
|
|
|
|
| 9,18 |
11.B.1. |
Community Business Support |
|
|
| $99,432.42
|
|
| $99,432.42
|
| 7,12,23 |
|
ENVIRONMENT AND TRANSPORTATION |
12.A.1. |
Environmental Projects Partnerships |
| $62,450.00
| $62,450.00
| $60,000.00
|
|
| $122,450.00
|
| 1,13,14,16 |
12.B.1. |
Brownfield Conversions |
| $5,500.00
| $5,500.00
|
|
|
| $5,500.00
|
| |
12.C.1. |
Land and Water Stewardship Projects |
| $5,500.00
| $5,500.00
|
|
|
| $5,500.00
|
| |
12.D.1. |
Community Gardens |
| $9,125.00
| $9,125.00
| $12,846.07
|
|
| $21,971.07
|
| 7,13,16 |
12.E.1. |
Sustainable Housing Development |
|
|
|
|
|
|
|
| |
13.A.1. |
Promote Green/Sustainable Infrastructure on Lake |
| $3,500.00
| $3,500.00
| $5,000.00
|
|
| $8,500.00
|
| 11 |
13.B.1. |
Improve Bicycling Facilities |
| $3,500.00
| $3,500.00
| $11,805.19
|
|
| $15,305.19
|
| 7 |
13.C.1. |
River Lake Greenway |
| $7,000.00
| $7,000.00
|
|
|
| $7,000.00
|
| |
14.A.1. |
Sustainability Issues |
| $29,925.00
| $29,925.00
|
|
|
| $29,925.00
|
| 16 |
|
RIVER GORGE |
15.A.1. |
Fundraising for Ecological Restoration |
|
|
|
|
|
|
|
| |
15.A.2. |
Ecological Restoration Activities |
| $70,000.00
| $70,000.00
| $6,103.00
|
|
| $76,103.00
|
| 1,9,14,16 |
15.B.1. |
Fundrasing for Trail Improvements |
|
|
|
|
|
|
|
| |
15.B.2. |
Trail Improvement Activities |
| $35,000.00
| $35,000.00
| $1,797.25
|
|
| $36,797.25
|
| 7,16 |
15.C.1. |
Improve Water Quality |
| $20,500.00
| $20,500.00
| $6,500.00
|
|
| $27,000.00
|
| 9,11,16 |
|
TOTAL | $74,392.50
| $2,232,084.50
| $2,306,477.00
| $1,559,904.22
| $531,200.00
| $135,082.82
| $4,532,664.04
| $1,722,773.38
| |
|
|
Phase II Plan Allocation Available in First Three Years (80%) | $2,306,477.00
|
Phase II Plan Allocation Percentage for Housing | 75% |
Phase II Affordable Housing Reserve Fund $ | $500,000.00
|
Phase II Community-Oriented Public Safety Initiatives Reserve Fund $ | $31,200.00
|
** On March 22, 2004, the NRP Policy Board adopted a policy that requires each neighborhood to limit its Phase II Neighborhood Action Plan obligations to no more than 80% of their neighborhood allocation during the first three years following approval of its Action Plan. |
|
PLAN MODIFICATIONS |
No. | Plan Step Modified | Approved | Description |
1 | Full Action Plan | 05/16/07 | The NRP Director approved a modification to the plan to reallocate a total of $22,922 in Phase I funds to Phase II strategies. The funds are reallocated from the following strategies:
(1) $2,922 in 1997 from River Corridor Protection (Environment and Transportation 1); and (2) $20,000 in 1996 from Bicycling Initiatives (Environment and Transportation 6). The funds are reallocated to the
following Phase II strategies: (1) $20,000 in 1996 to Environmental Projects Partnerships (Phase II, Environment and Transportation 12.A.1.); and (2) $2,922 in 1997 to Ecological Restoration Activities
(Phase II, River Gorge 15.A.2.). (This is Phase I Plan Modification #30 and Phase II Plan Modification #1.) The modification also reallocates $1,235 in 1996 from Bicycling Initiatives (Environment and
Transportation 6) to Traffic Calming (Environment and Transportation 7).
|
2 | Full Action Plan Pending | 06/02/08 | The NRP Director approved a plan modification to reallocate $24,850 in Phase I funds to the following Phase II strategies:
(1) $3,500 to Communications to Welcome and Inform Residents (Community Connections 2.A.1.); and (2) $21,350 to Longfellow History
Project (Community Connections 3.C.1.). (This is Phase I Plan Modification #31 and Phase II Plan Modification #2.)
|
3 | Full Action Plan | 07/09/09 | The NRP Director approved a plan modification to reallocate $24,000 in Phase I funds to Phase II strategy, Phase II
Administrative Support (Implementation and Administration 1.B.1.) (This is Phase I Plan Modification #33 and Phase II Plan Modification #3.)
|
4 | Full Action Plan | 11/18/09 | The NRP Director approved a plan modification to reallocate $24,999 in Phase I funds to Phase II strategy, Phase II Administrative Support (Implementation and Administration 1.B.1.) (This is Phase I Plan Modification #34 and Phase II Plan Modification #4.) |
5 | Full Action Plan | 05/27/10 | The NRP Director approved a plan modification to reallocate $150,000 in Phase I funds to Phase II strategy, Phase II Administrative Support (Implementation and Administration 1.B.1.) (This is Phase I Plan Modification #35 and Phase II Plan Modification #5.) |
6 | Full Action Plan | 11/09/11 | The NRP Director approved a plan modification to reallocate $100,000 in Phase I funds to Phase II strategy, Phase II Administrative Support (Implementation and Administration 1.B.1.) (This is Phase I Plan Modification #36 and Phase II Plan Modification #6.)
|
7 | Full Action Plan | 12/16/11 | The NRP Director approved a modification to the plan to reallocate a total of $220,070.71 in Phase I funds to Phase II strategies. The funds are reallocated to the following Phase II strategies: (1) $146,918.38 to Phase II Administrative Support (Implementation and Administration 1.B.1.); (2) $5,390.13 to Youth Engagement Program (Community Connections 4.A.2.); (3) $4,912.32 to Support Block Clubs (Community Connections 5.A.2.); (4) $25,000 to Commercial Revitalization Staff Support (Commercial 10.A.1.); (5) $11,401.37 to Community Business Support (Commercial 11.B.1.); (6) $12,846.07 to Community Gardens (Environment and Transportation 12.D.1.); (7) $11,805.19 to Improve Bicycling Facilities (Environment and Transportation 13.B.1.); and (8) $1,797.25 to Trail Improvement Activities (River Gorge 15.B.2.). (This is Phase I Plan Modification #37 and Phase II Plan Modification #7.) The modification also reallocates $149,194.53 from Home Improvement Program (Housing 7.A.1.) to Housing Office (Housing 6.A.1.).
|
8 | Full Action Plan | 03/06/12 | The NCR Director approved a plan modification to reallocate $12,000 in Phase I Rollover from Phase II Administrative Support (Implementation and Administration 1.B.1.) to Longfellow History Project (Community Connections 3.C.1.). (This is Phase I Plan Modification #38 and Phase II Plan Modification #8.) |
9 | Full Action Plan | 05/15/13 | The NCR Director approved a plan modification to reallocate $4,681 in Phase I funds to the following Phase II strategies: (1) $3,181 to Ecological Restoration Activities (River Gorge 15.A.2.); and (2) $1,500 to Improve Water Quality (River Gorge 15.C.1.). (This is Phase I Plan Modification #39 and Phase II Plan Modification #9.) The modification also revises the wording of two strategies: (1) Commercial Revitalization Staff Support (Commercial Revitalization 10.A.1.) and (2) New and Existing Business Staff Support (Commercial Revitalization 11.A.1.) are revised to allow for additional uses in addition to staff support. |
10 | Full Action Plan | 05/19/14 | The NCR Director approved a plan modification to reallocate $5,000 from Community History Play (Community Connections 3.A.3.) to Promote Longfellow Businesses (Community Connections 3.B.2.) |
11 | Full Action Plan | 07/31/15 | The NCR Director approved a plan modification to reallocate $10,000 in Phase I funds to the following Phase II strategies: (1) $5,000 in to Promote Green/Sustainable Infrastructure on Lake (Environment and Transportation 13.A.1.); and (2) $5,000 to Improve Water Quality (River Gorge 15.C.1.). (This is Phase I Plan Modification #40 and Phase II Plan Modification #11.)
|
12 | Full Action Plan | 02/02/17 | The NCR Director approved a plan modification to reallocate $346,932.42 of Phase I funds to the following Phase II strategies: (1) $150,000 to Phase II Administrative Support (Implementation and Administration 1.B.1.); (2) $100,000 to Home Improvement Program (Housing 7.A.1.); and (3) $96,932.42 in Program Income to Community Business Support (Phase II Plan, Commercial Revitalization 11.B.1.). (This is Phase I Plan Modification #41 and Phase II Plan Modification #12.) |
13 | Full Action Plan | 08/30/17 | The NCR Director approved a plan modification to reallocate a total of $11,000 from the following strategies: (1) $5,000 from Promote Longfellow Businesses (Community Connections 3.B.2.); and (2) $6,000 from Community Gardens (Environment and Transportation 12.D.1.). The funds are reallocated to the following strategies: (1) $1,650 to Communications to Welcome and Inform Residents (Community Connections 2.A.1.); (2) $1,650 to Youth Engagement Program (Community Connections 4.A.2.); (3) $1,700 to Facilitate Access to Crime and Safety Information (Community Connections 5.A.1.); and (4) $6,000 to Environmental Projects Partnerships (Environment and Transportation 12.A.1.). The modification also revises the wording of Environment and Transportation Objective 12.A. to include all of the Longfellow community. |
14 | Full Action Plan | 11/13/17 | The NCR Director approved a plan modification to reallocate $342,000 from Housing Development Incentives (Housing 8.A.1.) to the following strategies: (1) $85,500 to Communications to Welcome and Inform Residents (Community Connections 2.A.1.); (2) $171,000 to Environmental Projects Partnerships (Environment and Transportation 12.A.1.); and (3) $85,500 to Ecological Restoration Activities (River Gorge 15.A.2.).
|
15 | Full Action Plan | 12/22/17 | The NCR Director approved a plan modification to reallocate $14,000 in Phase I funds to Phase II strategy, Communications to Welcome and Inform Residents (Community Connections 2.A.1.). (This is Phase I Plan Modification #42 and Phase II Plan Modification #15.)
|
16 | Full Action Plan | 08/01/18 | The NCR Director approved a plan modification to reallocate a total of $226,831 from the following strategies: (1) $58,781 from Communications to Welcome and Inform Residents (Community Connections 2.A.1.); (2) $122,550 from Environmental Projects Partnerships (Environment and Transportation 12.A.1.); and (3) $45,500 from Ecological Restoration Activities (Environment and Transportation 15.A.2.). The funds are reallocated to the following strategies: (1) $10,688 to Support Community Volunteers (Community Connections 2.A.2.); (2) $16,030 to Promote Institutions that Foster Relationships (Community Connections 2.A.4.); (3) $21,375 to Facilitate Access to Crime and Safety Information (Community Connections 5.A.1.); (4) $10,688 to Support Block Clubs (Community Connections 5.A.2.); (5) $9,000 to Housing Office 2 (Housing 6.A.1.); (6) $76,500 to Commercial Revitalization Support (Commercial Revitalization 10.A.1.); (7) $7,125 to Community Gardens (Environment and Transportation 12.D.1.); (8) $29,925 to Sustainability Issues (Environment and Transportation 14.A.1.); (9) $30,000 to Trail Improvement Activities (River Gorge 15.B.2.); and (10) $15,500 to Improve Water Quality (River Gorge 15.C.1.).
|
17 | Full Action Plan | 11/06/18 | The NCR Director approved a plan modification to reallocate $12,000 from Communications to Welcome and Inform Residents (Community Connections 2.A.1.) to Longfellow History Project (Community Connections 3.C.1.).
|
18 | Full Action Plan | 10/18/19 | 18. On October 18, 2019, the NCR Director, based on Policy Board approval, approved a plan modification to reallocate a total of $345,971.64 ($310,971.65 in Action Plan Funds and $35,000 in Program Income) to Phase II Administrative Support (Implementation and Administration 1.B.1.). The funds are reallocated from the following strategies: (1) $106,805.47 ($71,805.47 in Action Plan funds and $35,000 in Program Income) from Home Improvement Program (Housing 7.A.1.); (2) $70,000 from Incentives for Sustainable Technologies (Housing 7.A.2.); (3) $79,667.35 from Housing Development Incentives (Housing 8.A.1.); (4) $39,998.82 from Commercial Revitalization Staff Support (Commercial Revitalization 10.A.1.); (5) $18,500 from Improve Bicycle and Pedestrian Conditions (Commercial Revitalization 10.C.1.); and (6) $31,000 from New and Existing Business Staff Support (Commercial Revitalization 11.A.1.).
|
19 | Full Action Plan | 02/25/20 | The NCR Director approved a plan modification to reallocate $1,440 from Promote Institutions that Foster Relationships (Community Connections 2.A.4.) to Senior Initiatives (Community Connections 4.A.1.).
|
20 | Full Action Plan | 06/21/23 | The NCR Director approved a modification to the plan to reallocate a total of $187,000 in Phase I funds to Phase II strategies. The funds are reallocated to the following strategies: (1) $15,000 to Phase II Administrative Support (Implementation and Administration 1.B.1.); (2) $40,000 to Community Art Events (Community Connections 3.A.2.); (3) $92,000 to Home Improvement Program (Housing 7.A.1.); and (4) $40,000 to Environmental Projects Partnerships (Environment and Transportation 12.A.1.). (This is Phase I Plan Modification #43 and Phase II Plan Modification #20.) The modification also revises the wording of two strategies: (1) Community Art Events (Community
Connections 3.A.2.) is revised to include projects, programs and activities; and (2) Environmental Projects Partnerships (Environment and Transportation 12.A.1.) is revised to include additional projects, programs and events.
|
21 | Full Action Plan | 07/13/23 | The NCR Director approved a plan modification to reallocate $195,078.70 of Phase I funds to Phase II Administrative Support (Implementation and Administration 1.B.1.). (This is Phase I Plan Modification #44 and Phase II Plan Modification #21.)
|
22 | Full Action Plan | 08/22/22 | The NCR Director approved a plan modification to reallocate $195,078.70 of Phase I funds to Phase II Administrative Support (Implementation and Administration 1.B.1.). (This is Phase I Plan Modification #45 and Phase II Plan Modification #22.)
|
23 | Full Action Plan | 08/24/23 | The NCR Director approved a plan modification to reallocate $40,291.69 of Phase I funds to Phase II Administrative Support (Implementation and Administration 1.B.1.). The modification also reallocates a total of $22,489.37 of funds previously rolled over from Phase I to Phase II Administrative Support (Implementation and Administration 1.B.1.) from the following strategies: (1) $288 in Phase I Rollover from Home Improvement Program (Housing 7.A.1.); (2) $13,300 in Phase I Rollover from Commercial Revitalization Staff Support (Commercial Revitalization 10.A.1.); and (3) $8,901.37 in Phase I Rollover from Community Business Support (Commercial Revitalization 11.B.1.). (This is Phase I Plan Modification #46 and Phase II Plan Modification #23.) The modification also reallocates a total of $132,297.65 ($36,472.83 in Action Plan funds and $95,824.82 in Program Income) to Phase II Administrative Support (Implementation and Administration 1.B.1.) from the following strategies: (1) $95,824.82 in Program Income from Home Improvement Program (Housing 7.A.1.); (2) $28,332.65 in Action Plan
funds from Housing Development Incentives (Housing 8.A.1.); (3) $8,139 in Action Plan funds from Support for Increased Housing Options (Housing 9.A.1.); and (4) $1.18 in Action Plan funds from Commercial Revitalization Staff Support (Commercial Revitalization 10.A.1.).
|
24 | Full Action Plan | 06/28/24 | The NCR Director approved a plan modification to reallocate $76,500 from Commercial Revitalization Staff Support (Commercial Revitalization 10.A.1.) to Home Improvement Program (Housing 7.A.1.).
|
|